• Crabtree Basin Wastewater Conveyance System
  • Crabtree Basin Wastewater Conveyance System
  • Crabtree Basin Wastewater Conveyance System
  • Crabtree Basin Wastewater Conveyance System

Project Details

  • Completed

    Ongoing

  • Location

    Raleigh, NC

  • Size

    7 miles

  • Owner

    City of Raleigh Public Utilities Department (CORPUD)

  • Categories

  • Tags

Project Description

Falcon provided geotechnical subsurface investigations for the proposed lift station expansion and the entire proposed new gravity interceptor alignment on the order of seven miles in length. Nearly 200 borings were drilled in a multi-phase investigation along the banks of Crabtree Creek spanning across the heart of Raleigh.