• Meadowmont Trail Bridges – Wetlands and TnE Survey

Project Details

Project Description

This project involved the replacement of two wooden pedestrian bridges with two steel bridges located on an approximate four foot wide unpaved walking path. Falcon was contracted to provide wetland delineation and 401/404 permitting as needed, as well as a geotechnical investigation to assist them in determining foundation suitability for the two new bridges.