The Good Hope Church Road Water Storage Tank project consists of a 2 million gallon elevated water storage tank and pump station. The new tank provides additional storage for the water system, helps maintain system pressure, reduces the demand on the transmission mains during peak flow conditions, and provides reserve capacity during firefighting or system maintenance activities. Falcon provided materials testing and special inspections during construction of the tank.
Crabtree Basin Wastewater Conveyance System
Falcon provided geotechnical subsurface investigations for the proposed lift station expansion and the entire proposed new gravity interceptor alignment on the order of seven miles in length. Nearly 200 borings were drilled in a multi-phase investigation along the banks of Crabtree Creek spanning across the heart of Raleigh.