NCSU Carter-Finley Stadium

Client

North Carolina State University
Raleigh, North Carolina

Project

NCSU Carter-Finley Stadium Renovations
A new 75,000 square foot sand-based field to replace the old field and resolve "crowning" issues

Cost

$1 million

Disciplines

Agency CM | Construction Materials Testing | Quality Assurance Services | Environmental Permitting

Falcon Engineering was contracted to perform Agency CM, Inspections, and CMT services for the replacement of Carter-Finley Field for North Carolina State University. This project consisted of removal of 36” of soil overburden— including the crown in the center of the field— replacement of old drainage, and installation of new drainage, irrigation, and sod. The new field has a minimal slope and allows for the quick drainage of runoff throughout the field before being conveyed away from it. Falcon was instrumental in maintaining control over very tight tolerances of materials and workmanship in an effort to be certain the field would perform as designed. In addition, Falcon processed and addressed charge orders, RFIs, pay applications, and designed the Sedimentation and Erosion Control Plan. This project, completed in August of 2009, is a source of pride for Wolfpack fans everywhere.

Falcon received the American Council of Engineering Companies (ACEC) 2011 Engineering Excellence Award for work on this project.

Back

©2008-2011 Falcon Engineering. All Rights Reserved.
Site Design by S&A Cherokee
Contact Us
Image 01 Image 01 Image 01 Image 01 Image 01 Image 01